Material above Ground
There
are such materials that were used to build the above ground shape. The
materials are piers, pier caps and viaduct deck segment.
Pier:
It
is the column that we put above the pile as a completion of the pile. That is
to make it a strong and stable to the body of the project (the Viaduct form),
so it will not be affected by the weather such as air storm.
Pier cap:
It
is the completion part of the pier which we put above the pier. There are holes
that are required in the pier caps to attach them with the piers which have the
reinforcement bars. That is to make in one shape.
Viaduct deck segment:
The
shape of the piers jointing with the pier caps are made to carry the viaduct
deck segment.
This
figure give’s the engineers an artist’s impression of the viaduct which was
proposed at the conceptual design stage.
“The
viaduct superstructures were typically formed from U-shaped cross sections. The
post-tensioned precast segmental deck segments were cut using either long line
or short line moulds” (Hendy, C et al, page: 4)
These two figures illustrate the
previous idea:
“The
viaduct substructures generally comprise reinforced concrete piers, with flared
pier heads to support the deck, and reinforced concrete abutments” (ibid, page:
4). The pier heads are for the single spans. The spans which were constructed
by using the method of thin precast reinforced concrete shells are twin spans
and station spans. “The pier heads for the single track and 3-span continuous
internal piers are of in situ reinforced concrete construction. All piers and
abutments are founded on large diameter bored piles” (ibid, page: 4).
Material Underground
There
are such services for the underground like, water supply, sewage drainage,
electrical cables, military services and telecommunication. Before we start the
construction building we have to do piling. That is to say that piling is the
foundation for the whole project. Before we put the piles in the ground we have
to excavate sand from the ground because if excavation work has not been done,
this will affect the pile works underground and it will damage services
underground also. Pile is one part of foundations, pile is used for bridges and
high buildings that contain 30 floors or more and last for long period of time.
The pile is placed underground after using heavy equipment’s like rig machine.
“This machine is used for drilling the ground to reach the hard level of soil
of the earth” (Mohamed Ali, 2010). After drilling and reaching the hard level
of soil in the earth the structural steel is inserted like rebar and concrete
is poured to the ground level. Pier is a part that supports the body of the
project structure which is the pier cap. “All piles and piers are casted in the
construction site” (Mohamed Ali, 2010).
Tunnels
Two
lines of the metro system are currently under construction. The red line is not
totally constructed, but it will have twenty-nine stations four of them will be
underground, the green line will have fourteen stations six of them will be
below ground and they will have interchange between them. The work for new tow
lines underground is extended due to financial problems. Blue line and purple line are the two lines
that will be constructed underground. Before beginning construction work
underground there are several tests that must be done for the tunnel. These
tests are bore holes and insitu-test within bore holes, lab testing, pumping
trials and surveys. To make the tunnel underground first of all we have to dig
with a big digging machine and every step they finish underground they put
wood, concrete and steel bars to make it more safe and good for the
reinforcement.